503-682-9925 | Employee Login

AWARDED – City of West Linn – Cedar Oak Boat Ramp Reconstruction

Work generally consisted of demolition of the existing boat ramp (concrete ramp, existing floating docks and removal of existing driven pile), install of geotextiles, import of structural fill to bring up grade, excavations, clearing and grubbing, install new steel boat ramp rails, install new concrete planks, drive six (6) new pile, import of class 700 rip rap and river cobbles, mass concrete pour with v-groving was performed, new ramp abutments, paving, striping and new signs and new curbing. Bernert Nursery donated new plants for restoration.